Fig. 2-3 Breaker Mounting Bolt Drilling Plan
Fig. 2-4 Circuit Breaker Escutcheon Dimension
Fig. 2-5 Securement of Cable (See caution note for
bracing instruction)
HAZARDOUS VOLTAGE CONDITIONS CAN CAUSE
DEATH OR SEVERE PERSONAL INJURY. MAINTAIN
ORIGINAL ELECTRICAL CLEARANCE AND CREEP-
AGE SPACINGS AT TERMINATIONS.
After the circuit breaker is installed and all connections
are made, check all mounting hardware and terminal
connection hardware for torque loading. Torque values
for line/load terminal lugs are given on the circuit breaker
nameplate and table in Fig. 2-1. Torque mounting screws
to 30-35 Ib-ft. (41-47 Nm).
Re-install load end and line end covers and secure with
pan head screws provided. Torque large screws to 35-45
Ib-in. (4.0-5.0 Nm) and small screws to 24-30 Ib-in
(2.7-3.4 Nm).
When prospective fault currents of cabled
UNSUPPORTED CABLES CAN CAUSE MINOR PER-
SONAL INJURY OR EQUIPMENT DAMAGE UNDER
SHORT CIRCUIT CONDITIONS.
WARNING
CAUTION
installations exceed 65kA the conductors are to be
braced in accordance with Fig. 2-5.
40752-093(1) Effective 5/02