Rockwell-automation 1494V-M70_M7_M72 Variable Depth, Flange Operated C Manual de usuario Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
Circuit Breaker Installation (Cont'd)
Variable Depth, Flange Operated Circuit Breaker Mechanisms
7
4c
Publication 1494V-IN105E-EN-P - September 2014 PN-242292 DIR 10000787413 (Version 04)
23 - 37 lb-in
17 lb-in
40 - 60 lb-in
Go to Page 11 to assemble connecting rod and springs to handle
8
Attach toggle adjustment plate
140G-K; 140MG-K
1
Verify that the disconnect handle and toggle on
the circuit breaker are in the “OFF” position.
2
Rotate connecting rod into drive bar
(10) full turns of engagement.
3
Install circuit breaker operating
mechanism into panel.
L
L
R
R
L
L
TAPE
6
Press rmly in place.
4
Install insulation barrier (provided with circuit breaker).
Remove liner from two-sided tape.
5
Align holes on insulation barrier with holes on operating mechanism.
7
Install circuit breaker onto
insulation barrier and mechanism.
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 15 16

Comentarios a estos manuales

Sin comentarios