Installation InstructionsOptionalCommunicationsModuleL2L1T3T2T1 L3INPUTOUTPUTUSE 75 CCOPPER WIREONLYTORQUE52 IN-LB(6 N-M)BR2PS+PS–BR1 DC+ DC–USE 75 C
2SCR ReplacementA. Locate SCR to be replaced. Note cable placement and disconnect Gate Leads.B. Disconnect the “SCR+” and “SCR–” cables. Remove the SC
3D. Re-assemble in reverse order. Tighten cable screws to 4.0 ±1.0 N-m (35 ±9.0 lbf.-in.).E. If no further replacement is needed, re-assemble drive. T
4www.rockwellautomation.comAmericas: Rockwell Automation, 1201 South Second Street, Milwaukee, WI 53204-2496 USA, Tel: (1) 414.382.2000, Fax: (1) 414
Comentarios a estos manuales