Rockwell-automation FactoryTalk Scheduler Users Guide Manual de usuario Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 146
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
3 THE FACTORY OVERVIEW
21
• • • • •
Purchased components
In addition to the manufactured components, we also have purchased components that are
used in the assembly operations. Purchase orders for these components are automatically
generated by the MRP (based on the economic lot size and lead times) to meet the
manufacturing demands. The following table summarizes the purchased components for
this same sample ten-day production period.
Material Name Quantity Date
Pedal and Chain Assembly 60 6/10/02 6:00 PM
Pedal and Chain Assembly 60 6/13/02 6:00 PM
Pedal and Chain Assembly 60 6/19/02 6:00 PM
Brakes 75 6/12/02 6:00 PM
Brakes 75 6/18/02 6:00 PM
Wheels 48 6/12/02 6:00 PM
Wheels 48 6/17/02 6:00 PM
Wheels 48 6/19/02 6:00 PM
Derailleur Assembly 60 6/12/02 6:00 PM
Derailleur Assembly 60 6/17/02 6:00 PM
Derailleur Assembly 60 6/20/02 6:00 PM
Seat 100 6/10/02 6:00 PM
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 145 146

Comentarios a estos manuales

Sin comentarios