Rockwell-automation GV3000/SE Operator Interface Module (OIM) User Gui Manual de usuario Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 112
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
Installing, Powering, and Adjusting the OIM
3-3
Step 4. Deburr the drilled holes and cutout.
Step 5. Remove the backing from the gasket. Place the gasket around the cutout on
the inside of the enclosure door.
Step 6. Place the OIM on the gasket and align the mounting holes.
Step 7. Place the bezel around the cutout on the outside of the enclosure hole and
align the mounting holes.
Step 8. Secure the bezel and the OIM to the enclosure door using the hardware
included in the kit.
Step 9. Attach the serial cable to the OIM. Provide appropriate strain relief support
for the cable.
Step 10. Connect the OIM ground wire to an appropriate enclosure ground.
Figure 3.1 – Enclosure Cutout Dimensions
!
ATTENTION:The user must install an appropriate hardwired equipment
ground between the OIM, the drive, and the drive enclosure. This
prevents electrostatic discharge within the equipment. Failure to
observe this precaution could result in damage to or destruction of the
equipment.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 111 112

Comentarios a estos manuales

Sin comentarios

BlackWing Projectors user manuals

The list of BlackWing Projectors products contains 1 user manuals for 1 models. All pdf user’s guides are available for download or viewing online.

Click on an alphabet below to scroll to the full list of models starting with that letter

Models Document Type
MK 2013
User Manual   MFE Mark III Mapping Scanner Operation and Maintenance Manual, 73 pages