Triguard
SC300E
REMOVAL AND REPLACEMENT
Removal
CAUTION
To
prevent
battery
drain
in
storage,
the
backup
batteries
fitted
to
new
modules
have
insulation
tabs
fitted
to
their
positive
termina
l.
Remove
these
tabs
before
installing
new
modules.
Ensure
link
LK14
to
Position
2 to
enable
battery
backup.
The
following
applies
to
both
faulty
and
non
-
faulty
MPPs:
1.
Turn
the
front
panel
keyswitch
to
RESET.
2.
Remove
the
MPP.
Replacement and warm start with two MPPs already running
1.
Turn
the
new
MPPs
front
panel
keyswitch
to
RESET.
2.
Insert
the
new
MPP.
3.
Turn
the
new
MPPs
front
panel
keyswitch
to
RUN.
This
will
initiate
a self
test
procedure.
4.
Wait
for
the
following
LED
states
to
stabilise
on
the
MPP
front
panel:
RUN
-
on
ON
LINE
-
on
PROGRAM
-
off
TEST
-
on
HEALTH
-
on
I/O
SCAN
-
on
BATTERY
-
off
SI/O
COMMS
-
off
5.
At
a TriBuild
workstation:
a)
From
the
TriBuild
main
menu
select
View.
b)
From
the
View
drop
-
down
menu
select
Diagnostics.
c)
From
the
Diagnostics
drop
-
down
menu
select
Warm
Start
Processor.
Comentarios a estos manuales