Publication 1785-UM024B-EN-P - January 2003
Backup Concepts for the ControlNet PLC-5 Backup System 1-5
Switchover
Switchover is what occurs when the secondary programmable
controller assumes control of the process, thus becoming the primary
programmable controller. Several conditions can cause this to happen:
critical failures in the primary programmable controller (e.g.,
hardware faults)
internal conditions within the primary programmable controller
(e.g., a major fault), causing it to relinquish control of the
process to the secondary programmable controller
external conditions recognized by the secondary programmable
controller (e.g., loss of communications with the primary
programmable controller), causing it to assume control of the
process
a manual switchover (i.e., a forced switchover, where you cause
the secondary programmable controller to become primary, and
vice versa; you may choose to do this when testing your system
for backup performance and integrity, or as part of a system
maintenance program).
The ideal switchover time from the primary programmable controller
to the secondary programmable controller would be instantaneous.
The ControlNet PLC-5 hot backup system typically provides a
switchover time of 30-50 ms. This time is adequate to avoid a bump in
most systems, but you should determine the maximum allowable
switchover time for your applications.