Rockwell-automation 1794-FLA FlexLogix Controller Installation Instruc Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
10 FlexLogix Controller System
Publication 1794-IN002G-EN-P - January 2004
Step 2: Install the Battery
For Safety information on the handling of lithium batteries, including handling and
disposal of leaking batteries, see Guidelines for Handling Lithium Batteries,
publication AG 5-4.
1. Install a 1756-BA1 battery.
2. Attach the battery label:
a. Write on the battery label the date you install the battery.
b. Attach the label to the inside of the battery compartment.
ATTENTION
Only install a 1756-BA1 battery. If you install a different battery,
you may damage the controller.
WARNING
For safety information on the handling of lithium batteries, in-
cluding the handling and disposal of leaking batteries, see Guide-
lines for Handling Lithium Batteries, publication AG-5.4.
Store batteries in a cool, dry environment. We recommend 25°C
with 40% to 60% relative humidity. You may store batteries for
up to 30 days between -45° to 85°C, such as during transporta-
tion. To avoid possible leakage, do not store batteries above 60°C
for more than 30 days.
When you connect or disconnect the battery an electrical arc can
occur. This could cause an explosion in hazardous location in-
stallations. Be sure that power is removed or the area is nonhaz-
ardous before proceeding.
Attach battery here.
top red lead (+)
middle black lead (-)
bottom no connection
Attach label here.
This jumper is for service use
only. Do not use this jumper.
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 27 28

Comentarios a estos manuales

Sin comentarios