Rockwell-automation MMCL Using the Mining, Mineral, and Cement Library Manual de usuario Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 62
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
Publication RA-UM002B-EN-P - November 2010
30 Control Group
Timing situation with Restart condition (Restart Request)
The following conditions changes the Group to “Restart Request”:
1. If any of the Alarms are on “move” - Devices such as MotorN/R/D or
Valve1,2. These Modules bring the alarm condition over the linked Bus
-chain up to the Group.
2. If the Group is in “Starting” -state and the CtrlGrp Input .PartRun is
true.
3. Or the Group is in “Running” -state and the CtrlGrp Input .AllRun
changes to false.
4. If the group is in "Starting" -state and the operator presses "Pause"
button on CtrlGrp HMI faceplate.
5. If the Group is in "Starting" -state and Starting Time Out timer times
out.
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 61 62

Comentarios a estos manuales

Sin comentarios