
Rockwell Automation Publication IASIMP-QS033A-EN-P - March 2012 21
Chapter
2
Create a PanelView Plus Application
In this chapter, you learn how to complete the following tasks:
• Create a push button and a multi-state indicator in FactoryTalk View Studio software.
• Transfer the application to the 2711P-K10C4D1 drive so you can test communication with
the controller.
Before You Begin
You must complete these tasks before using this chapter:
• The tasks described in Before Using This Publication on page 5, including:
– Prepare the Logix5000 control system hardware
– Prepare the computer
– Configure the networks - The tasks described in this chapter require an
EtherNet/IP network.
– Create an RSLogix 5000 project- In your RSLogix 5000 project, include a ladder logic
rung with Examine On and Output Energize elements as shown. In this example, the
alias tag named OB16_Light is an alias for point Local:1:O.Data.0.
The example RSLogix 5000 project used in this chapter uses a
CompactLogix 5370 L3 controller.
Comentarios a estos manuales