
Rockwell Automation Publication 1788-UM057B-EN-P - September 2014 25
Set Up in the Studio 5000 Logix Designer Application Chapter 2
6. On the Networks Parameters Tab, update the Max Unscheduled Address
if you are sure that the allocated range is less than 99.
7. Click OK.
8. Right-click any white space around the graphics and choose Download to
Network.
9. Select the correct save option for your configuration and click OK.
10. Enter a suitable file name.
11. Click Yes to download the configuration.
The ControlNet network is now scheduled and the graphics display green plus
signs.
Comentarios a estos manuales