
30 Rockwell Automation Publication 1788-UM057B-EN-P - September 2014
Chapter 2 Set Up in the Studio 5000 Logix Designer Application
Auto MacroCycle
Calculates the Macro Cycle based on the configured field devices and the number
of PVs configured. A window is also added for class II data communication.
Advanced
Opens the Advanced Settings window.
Load Defaults
Resets the configuration settings to their default values.
Update Master Time
Update the master time to local computer time.
Download Schedule
Download schedule to linking device.
Enable Schedule
The default is enabled. Used only when the Disable Schedule Function disables
the schedule.
Clear Schedule
Clear the schedule from the linking device and the AOP.
Disable Schedule
Disable the schedule from executing in the linking device.
Advanced
The Advanced button on the master configuration page launches the Master
Advanced configuration dialog box (see Master Configuration
on page 28).
This task is performed automatically when field devices are added or edited.
This action causes the module to stop compelling data.
We recommend that you do not alter these settings; doing so can cause loss of
communication.
Comentarios a estos manuales