Chapter 10 Glossary of Fields
174 Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014
Scheduled Unavailable Time
The scheduled unavailable time as defined by the work cell schedule.
Scrap %
The percentage of total parts produced that were rejected due to
poor quality. The calculation for this field is:
Scrap % = ScrapParts / TotalParts.
Scrap Parts
The number of parts rejected due to poor quality.
Shift
The shift during which the data was collected.
Shift Name
The name of the shift.
Shift Number
The number of the shift.
Shift Start
The start time of the shift during which the data was collected.