Rockwell-automation 8510 AC Spindle Drive System User Manual Manual de usuario Pagina 140

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 154
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 139
Troubleshooting
Chapter 11
11-136
Figure 11.4
High Resolution Magnetic Feedback Signals
90°
T
V
P-P
V
P-P
V DC
V DC
0.1 - 0.4T
V
P-P
V DC
T depends on the number of
gear teeth and gear speed.
T =
1
N x
1
/
60
x S
where:
N = Number of Teeth
S = Speed (rpm)
Amplitude of A/B:
V DC = 2.5V
V
P-P
= 3V
Amplitude of Z:
V DC = 2.5V
V
P-P
= 3V
Test Point A
and Ground
Test Point B
and Ground
Test Point Z
and Ground
Sensor
CW
Z Phase GearA/B Phase Gear
Installation
Face
Install the gear and sensor as shown. The specifications
above should be set at CW rotation when the
gear is viewed from the Z phase gear side.
Vista de pagina 139
1 2 ... 135 136 137 138 139 140 141 142 143 144 145 ... 153 154

Comentarios a estos manuales

Sin comentarios