
65Rockwell Automation Publication 1756-UM010B-EN-P - December 2011
Installing the Configurable Flowmeter Module 65
2. Slide the module into the chassis until the module locking tabs click.
Keying the Removable
Terminal Block/Interface
Module
Wedge-shaped keying tabs and U-shaped keying bands came with your RTB to
prevent connecting the wrong wires to your module.
Key positions on the module that correspond to unkeyed positions on the
RTB. For example, if you key the first position on the module, leave the first
position on the RTB unkeyed.
Key the Module
1. Insert the U-shaped band as shown in this figure.
2. Push the band until it snaps in place.
Comentarios a estos manuales