
18 Rockwell Automation Publication 6000-IN007A-EN-P - October 2014
Chapter 2 Preparation and Inspection
Table 3 - Inspect Drive Components Checklist
Bypass Cabinet (if supplied) Isolation Transformer Cabinet Power Module Cabinet Low Voltage Control Cabinet
Front
Door:
Pilot Lights
Voltage Indicator Relay
Cabinet:
Insulators
Switch assemblies
Vacuum contactors
Mechanical linkages
Door:
Transformer Temperature monitor
LV Cabinet components
– Fan control circuit breakers
Cabinet:
Transformer Plastic Baffle
Outgoing Motor Power Cable standoffs on
Cabinet Sidesheet
(1)
Outgoing Motor Power Cable Terminal
Insulators on transformer
(1)
Voltage Sensing Board
Incoming Line Power Cable Terminal Insulators
on transformer
Motor Cable Braces
Fixed Mounted Power Module Configuration:
Transformer Secondary Windings (2 sets)
– Inspect nomex wrap
– Verify windings from core are undamaged
– Check for debris in top of core
Fixed Mounted Power Module Configuration:
Power Module retaining tabs
Check for debris
Output Bus Supports
Fuse Mounting Supports
Drawout Power Module Configuration:
Support frame
Power Modules
Door:
Pilot lights
Push buttons
Selector switches
HMI
Interface board (on the back of the LV door)
Panel:
DIN rail mounted components
UPS
Fiber optic cables
PLC
Control Unit
Rear
Fixed Mounted Power Module Configuration:
Transformer Secondary Windings (1)
– Inspect nomex wrap
– Verify windings from core are undamaged
– Check for debris in top of core
Drawout Power Module Configuration:
Transformer Secondary Windings (3)
– Inspect nomex wrap
– Verify windings from core are undamaged
– Check for debris in top of core
Fixed Mounted Power Module:
Heat sink
– Verify orientation relative to barrier plates
Drawout Power Module:
Power In/Power Out connections
UPS connections
(1) Motor Cable terminations could be on the transformer structure or cabinet sidesheet, depending on the power rating.
Comentarios a estos manuales