Rockwell Automation Publication 6000-IN007A-EN-P - October 2014 19
Preparation and Inspection Chapter 2
Table 4 - Functional Assessment Checklist
Bypass Cabinet (if supplied) Isolation Transformer Cabinet Power Module Cabinet Low Voltage Control Cabinet
Front
Electrical Door Interlock
Verify proper operation of auxiliary contacts
with an ohmmeter
Isolation switch auxiliary contacts
Verify proper operation with an ohmmeter
Isolation switches
Verify proper operation
Outer jaws must securely contact the center
stab in the closed position
Secondary Wiring and Low Voltage Fuses
Check all connections per Electrical Drawings
Door Grounding Straps
Transformer Secondary Cables
Verify cables are properly fed through the
glanding plate and are undamaged
Voltage Sensing Board cables
Verify the primary and secondary connections
to the board are secure
Door Interlock Limit Switches
Test auxiliary switch contacts wired back to
terminal blocks in LV panel with ohmmeter
Temperature Sensing Wires (3 places)
Verify wires are intact and properly inserted
Bottom-mounted Auxiliary Fan power from
Isolation Transformer Auxiliary Winding
Check connections
Door Grounding Straps
Transformer Temperature Protection Relay
Tug test on all cable connections
Auxiliary Cooling Fans (3)
Check electrical connection
HECS (2)
Check plug connectors
Door Interlock Limit Switches (2)
Test switch contacts wired back to terminal
blocks in LV panel with ohmmeter
Power Modules fiber optic cables
Check all connections
Power Modules Fuses
Test each fuse with multimeter
Door Grounding Straps
Control Unit
Check connection of all fiber optic cables
Check connection of HMI interface board
HMI
Low Voltage wires
Tug test all wires on door, panel, and relays
and terminal blocks
Circuit Breakers and Contactors
Verify operation
Vertical Ground Bus
Check connections from all attached
components

Low Voltage Door
V
erify operation of all operator interface
devices
AC/DC Power Supplies
Check connections
Door Grounding Straps
Rear
Surge Arrestors
Check braided copper connections
Voltage Sensing Relay Cables
Perform tug test
Line and Load side power cables
Verify phasing and torque
Top Ground Bus
Verify braided connections
Transformer Secondary Cables
Verify cables are properly fed through the
glanding plate are undamaged
Tap Changer
Verify connection
Top Mounted Cooling Fans
Check electrical connection
Fan Housings
Assembly must be affixed properly to
structure
Auxiliary Cooling Fans (3)
Check electrical connection
Top Mounted Cooling Fans
Check electrical connection
UPS
Check connection