Rockwell-automation 2098 CompactLogix Indexing Motion Accelerator Tool Manual de usuario Pagina 79

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 136
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 78
Publication IASIMP-QS011B-EN-P — January 2009 79
Motion FactoryTalk View Integration Chapter 6
3. Repeat step 2 for each SelectedAxisx HMI tag.
Test the Project
FactoryTalk View Studio lets you create and test individual displays or the entire project, so that
you can navigate and test all the functionality before downloading your project to a terminal.
Follow these steps to test your FactoryTalk View Studio project.
1. Choose Application>Test Application.
2. If prompted to save changes, click Yes.
3. The FactoryTalk View Studio software compiles the
project and runs it as if it were executing on the desired
terminal.
4. Press ‘x’ to end testing and shut down the application.
IMPORTANT
To test run the project, all communications must be configured first.
Vista de pagina 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 135 136

Comentarios a estos manuales

Sin comentarios