
70 Rockwell Automation Publication 6000-IN006A-EN-P - April 2014
Appendix A Pre-Commissioning
Table 17 - Drive Line-up Status
Initials Date Check
The medium voltage and low voltage power is available for startup activities.
The motor is uncoupled from the driven load.
The load is available for full load testing.
Comentarios a estos manuales