Rockwell-automation GMLC Reference Manual Manual de usuario Pagina 380

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 958
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 379
Publication GMLC-5.2 - November 1999
Task Control 343
Turn on multitasking by re-enabling the previously disabled task
dispatcher (Restart Dispatcher Type).
The task control block resides on the Main Palette.
Start New Task
Start New Task enables multitasking and begins execution of a new task
while execution of the current task continues. The new task blocks are
attached to the bottom node, and the remaining current task blocks are
attached to the top node. The two tasks continue operating concurrently
(in parallel) until the program ends, or encounters a Task Control block
with either Stop Current Task or Stop Other Task selected.
For example, the following GML Commander diagram starts a second
task (task 1) while the main program (task 0) continues.
To start more than one additional task, cascade multiple Task Control
blocks with Start New Task selected.
Vista de pagina 379
1 2 ... 375 376 377 378 379 380 381 382 383 384 385 ... 957 958

Comentarios a estos manuales

Sin comentarios